• Slabs, Beams, Columns: When To Remove Concrete Formwork
    Slabs, Beams, Columns: When To Remove Concrete Formwork Mar 26, 2025
    Finding the appropriate time for removing the formwork is crucial for concrete strength, avoiding costly mistakes, and keeping your job on schedule. In this blog post, we’ll take you through all the information necessary for removing concrete formwork in a way that is informed—from what curing is to things to avoid. This blog will help anyone from DIY-ers to contractors.         Concrete Formwork and Curing   Concrete formwork are used to hold concrete structures in place, and they can be temporary or permanent. These molds may be made of wood, steel, and plastic, depending on the project. Formwork gives concrete its shape, whether it is a wall, slab, or beam. Meanwhile, curing is the process in which concrete is kept moist and at the proper temperature so that it can harden properly. It isn’t simply allowing it to dry, but giving time for the concrete to build strength and durability from the chemical reaction called hydration. If proper curing does not take place, concrete can crack, weaken in strength, or fail altogether. Knowing about curing is the basis for understanding when formwork can be removed.         How Long Does Concrete Take to Cure?   Curing does not follow a preset schedule. How long it will take depends on a multitude of factors, but here's the general idea: concrete typically reaches about 70% of its ultimate strength in 7 days, and continues to gain strength for another few weeks, reaching a key milestone at 28 days. That 28-day mark is often used as the measure of "full curing" for standard mixtures, although it can continue to gain strength beyond 28 days.Nevertheless, when removing formwork, waiting for full curing is not required. Concrete only needs enough strength to support itself.         Factors Influencing Formwork Removal Time     1. Type of Concrete Mix Concrete comes in many different types. A high-early-strength mix cures faster, allowing you to strip formwork faster—perhaps on the first day or second day. Standard concrete takes longer to cure to that stage. 2. Ambient Temperature Heat speeds up the curing process; cold slows it down. In the summer, it is likely the formwork will be removed sooner, and winter projects will need additional time—even insulated—to keep the curing process moving along. 3. Humidity Levels Low humidity dries out concrete too quickly, potentially stunting curing. High humidity keeps moisture in, aiding the process. You’ll need to adjust based on your environment. 4. Size and Type of Structure A thin wall cures faster than a thick slab. Larger or more complex structures—like beams or bridges—often need extended curing to ensure stability before formwork removal. 5. Load Conditions Once the forms are removed, will the concrete be subjected to heavy loading? If no, it will take longer to cure in order to handle the stress without failing. These factors don’t just affect curing—they dictate when your formwork can safely come down. Ignore them, and you’re rolling the dice on your project’s success.           When Can You Remove Concrete Formwork?     So, when’s the magic moment? It depends, but here are some industry-standard guidelines: Vertical Formwork (Walls, Columns) These typically need 24 to 48 hours. Once the concrete can hold its shape and resist minor loads, the formwork can go. Fast-setting mixes might even allow removal in as little as 12 hours. Horizontal Formwork (Slabs, Beams) These take longer—usually 7 to 14 days. Why? They bear more weight and span greater distances, so the concrete needs extra strength to avoid sagging or cracking. For bigger spans or heavy loads, you might wait up to 21 days. These are just starting points. Always check your project’s specifications or consult a structural engineer. Testing the concrete’s strength—via methods like cylinder tests—can also pinpoint the perfect time. Rushing this step isn’t worth the risk.         What Happens if You Remove Formwork Too Early?   Pulling formwork off too soon is a recipe for disaster. Here’s what could go wrong: Structural Damage Without enough strength, the concrete might crack, slump, or collapse entirely. Imagine a slab caving in under its own weight—nightmare fuel for any builder. Surface Defects Early removal can leave ugly marks like spalling (flaking) or honeycombing (voids). These don’t just look bad—they weaken the concrete over time. Safety Hazards Falling concrete or unstable structures put workers—and anyone nearby—at serious risk. Safety should never take a backseat to speed. The takeaway? Patience pays off. Let the concrete do its thing before you strip away its support.     Common Mistakes to Avoid   Even seasoned pros can slip up. Here are the big no-nos to steer clear of: 1. Ignoring Curing Conditions Don’t just set it and forget it. Monitor temperature and humidity, and adjust with water, covers, or heaters as needed. 2. Skipping Project Specs Every job is unique. Your engineer’s guidelines aren’t suggestions—they’re the rulebook. Follow them. 3. Rushing the Timeline Tight deadlines tempt shortcuts, but early removal can cost you more in repairs than it saves in time. 4. Poor Post-Removal Support Especially for slabs or beams, make sure the concrete has props or temporary supports if it’s not fully cured. Don’t leave it hanging. Avoid these, and you’ll sidestep headaches—and expensive fixes—down the road.     Can You Walk or Drive on Concrete Immediately After Formwork Removal?   Formwork’s off—can you start using the concrete right away? Not so fast. Here’s the deal: Walking Once vertical formwork is removed (after 24-48 hours), light foot traffic is usually fine. For slabs, wait until the formwork’s safely off—typically 7 days or more—before stepping on it. The surface should feel solid and stable. Driving Vehicles are a whole different beast. Light traffic (like a car) might be okay after 7-14 days, but heavy loads (trucks, machinery) need at least 28 days for standard mixes. Fast-curing concrete can shorten this, but always test the strength first. The concrete’s still curing even after formwork removal, so don’t push it too hard too soon. Check your mix details and load requirements to be sure.     Conclusion   Deciding when to remove concrete formwork isn’t guesswork—it’s a balance of science, timing, and good judgment. By understanding how concrete cures, factoring in variables like temperature and mix type, and avoiding common mistakes, you can ensure your project stands strong. Whether it’s a small patio or a towering wall, the rules are the same: let the concrete build enough strength to stand alone before pulling the forms. For the best results, lean on project specs, test when possible, and don’t hesitate to bring in an expert. Get this right, and you’ll have a durable, safe structure—and maybe even a top spot on Google for “when to remove concrete formwork.” Happy building!       FAQ   How to safely remove concrete formwork? Make sure the concrete has reached sufficient strength. Use appropriate tools and equipment to avoid damaging the structure. Remove gradually, from top to bottom, to prevent sudden load changes. Observe the concrete reaction during removal, and stop and check immediately if there is any abnormality. Construction workers need to wear safety equipment and follow operating procedures.   What should I do if cracks appear on the concrete surface after removing the formwork? Assess the severity of the cracks: Minor surface cracks may not affect the structure, but deeper cracks need to be repaired. Repair methods: Including epoxy injection, surface sealing or re-casting, depending on the situation. Preventive measures: Keep the concrete moist during curing and avoid premature loading.         Reference   How To Build Concrete Formwork? ---- Reddit Design of Concrete Formwork ---- UpCodes

Need Help? Chat with us

Leave a Message
If you are interested in our products and want to know more details, please leave a message here, we will reply you as soon as we can.
Submit
Contact us #
+86 -19924226648

Our hours

Mon 11/21 - Wed 11/23: 9 AM - 8 PM
Thu 11/24: closed - Happy Thanksgiving!
Fri 11/25: 8 AM - 10 PM
Sat 11/26 - Sun 11/27: 10 AM - 9 PM
(all hours are Eastern Time)

Home

Products

whatsApp

contact